Huwebes, Oktubre 1, 2015

Rough inspection

Just wondering what needs to be done for a remodel rough mechanical inspection. Ductwork was done previously for upflow furnace only, we are adding a/c and moving system to attic going with new horizontal furnace and coil, connecting ductwork and adding additional as needed. Single story home so 98% can be inspected on final. We made sure we had everything done that was going to be dry walled over. Plumbing and electrical failed (we didn't do either of those) do to not being complete upon inspection.

Walang komento:

Mag-post ng isang Komento